Page · p. 1original page ↗
ALL-UKRAINIAN CULTURAL WEEKLY 16 (1120), April 22—28, 2021 35 years of the Chornobyl disaster LYUBOV SERDUNYCH
Слово Просвіти, №16 за 2021 рік
We are the atomic hostages of progress, We no longer have forests or skies. So we live from stress to stress, We have an alphabet of death – NPP. Lina Kostenko In the whole world, when planning the construction of nuclear power plants, one of the basic conditions is fulfilled: the installation of nuclear power plants must be safe for the population. The state commission of the USSR created to select a site for the construction of an NPP in Ukraine was not incompetent – it was subordinate to the decisions of the top leadership and the party... The commission surveyed 16 points in the Kyiv, Vinnytsia, and Zhytomyr regions. The site was chosen 4 km from the village of Kopachi in the Chornobyl district on the right bank of the Pripyat River (in the upper reaches of three rivers that carry their waters into the Dnipro, and then into the Black Sea), 15 km from the city of Chornobyl, near the Yaniv station of the Chernihiv – Ovruch railway line. According to the results of the survey, the land on which the NPP was to be located was recognized as low-productivity and met the requirements for water supply, transport, and a sanitary protection zone. One does not need to “reach far with thoughts,” but simply think to be convinced of how many mistakes were made in the choice of the very site for the construction of the NPP, which were later considered as causes of the Chornobyl disaster. The commission’s conclusions stated: unsuitable, low-productivity territory. But in reality – it was the heart of Ukraine, the blue-eyed Polissia with forests and floodplains, fertile land that was famous for its potato fields and fed not only the USSR, but also foreign countries. A land rich in history, cultural monuments, with a characteristic ethnos and dialect. On this picturesque land, there were many recreation zones, sanatoriums, and pioneer camps. The choice of the site “in the upper reaches of three rivers...”, which carried their waters not only through Ukraine, but also further into the Black Sea!!! The territory had a high water table, which was not taken into account. Was the station built in a seismic zone?! Historians knew about this place of possible natural disasters. In 1530, one of the destructive underground tremors was recorded in Chornobyl as confirmation that the station is located in a zone of geological faults. During the construction of the station, the site was leveled because there were many depressions. After the accident, aerial photographs were taken, which showed that the sand had gone down into the geological environment. This opinion is confirmed by Academician of the NASU – geologist Vyacheslav Shestopalov. When building such facilities as an NPP, it is necessary to foresee in advance the danger that can be created by natural cataclysms, safety, possible sabotage, etc. The commission reported to the state leadership about the choice of the site for the construction of the NPP on the territory of Ukraine. And already on February 2, 1967, a document appeared under the stamp “Top Secret”: “Appeal of the Council of Ministers of the Ukrainian SSR to the Central Committee of the Communist Party of Ukraine on the approval of the design for the construction of the Central Ukrainian Power Plant near the village of Kopachi, Chornobyl district, Kyiv region”. In the 70s, the construction of the Chornobyl NPP became the largest in Ukraine and the USSR. Young people came from everywhere: it was planned that the Chornobyl nuclear power plant would provide electricity not only to all of Ukraine, but also to a part of the Russian SFSR. Such powerful facilities had not been built in Ukraine before. And qualified Ukrainian builders, who were not provided with work in their native lands, were scattering all over the Union, looking for places to work. And here was such a chance: to return home, to their native Ukraine. Of course, they returned! In addition to everything, such construction provided an opportunity to grow professionally and get pleasure from work, because they were building not “just anything,” but a powerful nuclear power plant! On paper, it was already the most powerful in the world!.. By the resolution of the Central Committee of the CPSU and the Council of Ministers of the USSR of May 29, 1969, the cost estimate for the construction of the priority facilities of the Chornobyl NPP was approved. The construction of the station and the satellite city of Pripyat was headed by the head of the administration V. T. Kyzyma and chief engineer I. P. Lukov. By the order of the Minister of Energy and Electrification of the USSR of December 17, 1969, the directorate of the Chornobyl NPP was organized from January 1, 1970, and from April 1970, V. P. Bryukhanov was appointed director of the V. I. Lenin Chornobyl NPP. Active construction work began. A commission for the acceptance of the Chornobyl NPP facilities was created. “On Builder’s Day, August 15, 1972, at 11 o’clock in the morning, the first cubic meter of concrete was solemnly laid in the foundation of the deaerator rack of the main building of the first stage of the station, and a stainless steel capsule with a letter to future generations was laid” (Wikipedia). The structures of all NPP buildings must meet the basic requirements: convenience for performing the main technological process, functional purposefulness of the building; reliability under the influence of the environment, strength and durability (technical purposefulness of the building; economy, but not to the detriment of durability (economic purposefulness); aesthetics (architectural and artistic purposefulness). The commission for the acceptance of NPP facilities strictly monitored the fulfillment of these requirements! The years of construction of the nuclear power plant were a period of intense work for builders of all levels. There were problems, and mainly – these were problems with the supply of materials and equipment. But everything went according to the state plan, with minor deviations, which were resolved in the course of work. The first power unit was put into operation on September 26, 1977. The second power unit began operating on November 16, 1978. The third power unit was launched on December 3, 1981. The f o u r t h power unit was brought to its design capacity on March 28, 1984. The Ministry of Energy of the USSR decided to use an RBMK-1000 type reactor at the station. The Chornobyl NPP became the third in the USSR with reactors of this type, after the Leningrad and Kursk NPPs. (The active zone of the RBMK consisted of graphite masonry. The masonry was pierced by vertical channels made of zirconium alloy. Water entered the reactor from below through the channels. There it was heated, and steam entered the turbine). According to the project, the capacity of the ChNPP was to reach 6000 MW. In April 1986, the station was producing 4000 MW. After the launch of the 5th and 6th power units, the figure of 6000 MW would have been reached... “The final year of the eleventh five-year plan was unusual for the Chornobyl NPP – all power units were operating at full capacity here at once. There had been nothing like this in the entire history of the operation of the atomic giant,” wrote the newspaper “IZVESTIYA” on January 6, 1986, 3.5 months before the tragedy. From the book by Lyudmyla Zhytnia “Chornobyl – through the eyes of women”. (read pages 8-9) NINA BERNADSKA LYUDMYLA ZHYTNIA TETIANA YUZVIAK 12-13 PETRO SHKRABIUK
«Слово Просвіти», CC BY 4.0; machine translation from Ukrainian by Prosvita.Digital · PDF on Wikimedia Commons ↗ · Machine translation
