Reflections on the development of nuclear energy in Ukraine
Слово Просвіти, №27 за 2004 рік
HISTORY... AND GEOGRAPHY. And not simple, physical geography (though our esteemed readers will get enough of that too), but political and economic. So, there was once a very, very large empire, as you remember, — “from the seas to the very outskirts.” And nuclear energy was developing in this empire. It was developing rapidly, because it could not be otherwise — such was the situation: the military-industrial complex demanded it, it was necessary to produce plutonium for nuclear warheads and other toys. However, similar things were happening all over the world. And no one really thought about whether this “by-product” of the arms race was all that safe, profitable, and clean, until April 26, 1986. When at one brand-new power unit of a nuclear power plant, in one of the provinces of the vast empire, something happened... Well, the whole world already knows what happened... But even before that, in this province, which was then called the “Ukrainian Soviet Socialist Republic,” they had built these nuclear power plants, as the saying goes among the people, to hell and back. The concentration of nuclear power plants on the territory of our state (in comparison with the scale of the former empire) is striking. And all this was supposed to expand. In 1974 of the last century, a project for the second power unit of the Khmelnytskyi NPP was developed, which, with the pace characteristic of the empire, was approved in 1979. In that same year, 1979, the project for the fourth power unit of the Rivne NPP was also developed, which was approved... (correct, after a five-year period) in 1984. Construction of these two power units with a capacity of 1000 MW each began in 1985 and in the year 1986, which was significant for this branch of energy. In accordance with the projects that were developed in the 70s. While construction was underway, the winds of history did their work. The empire disappeared from the political maps of the world, but a dozen and a half independent states appeared, which inherited the sad remnants of imperial scale and ruined economies. But even before 1991, in 1990, under pressure from the public, who did not really want a repeat of Chornobyl, the expansion of both NPPs, as well as the construction of the sixth power unit of the Zaporizhzhia NPP and the construction of the Crimean NPP, was stopped by a moratorium of the Verkhovna Rada. Unfortunately, in 1993, during a crisis in energy supply and problems with fuel procurement (understandably, the economies of the young states, which had severed all union ties and established options, and even in conditions of transition from a socialist economy to a market one, simply could not get out of crisis situations), the Ministry of Atomic Energy persuaded the Verkhovna Rada of Ukraine to lift the moratorium. Except for the Crimean one, construction of all NPPs was resumed. From 1993, completion was carried out at the expense of the Ministry of Atomic Energy. But Ukraine did not have enough money for such large-scale construction. In 1995, in accordance with the Memorandum of Understanding between Ukraine, the G7, and the European Union, it was agreed to allocate an international loan to Ukraine for the completion of the KhNPP-RNPP under the guarantees of the Government of Ukraine. One of the main participants in the lending was the European Bank for Reconstruction and Development (EBRD), which was to provide $215 million as a loan for 17 years. The EBRD is a rather cautious organization, so several assessments of the economic feasibility of the lending were conducted. In 1997, an international group of experts led by American scientist John Surrey conducted an examination, and they gave a categorically negative conclusion regarding the benefit for Ukraine and for the world community in general of completing KhNPP-2—RNPP-4. Then, commissioned by the EBRD, another American firm, “Stone & Webster,” conducted another examination, which recognized some feasibility in lending to this project. Let us leave this examination to the conscience of “Stone & Webster.” But in December 2000, the EBRD preliminarily approved the allocation of the loan and set a number of conditions for Ukraine. In 2001, based on the results of fulfilling the conditions, the EBRD Board of Directors was going to finally approve the allocation of funds. But on November 28, 2001, Ukraine refused Western loans and invited the Russian Federation to provide financing. Russia did not refuse this proposal, and this can be understood if only because the completion of the power units guarantees Russia an expansion of the market for nuclear fuel sales... However, in 2003, in addition to Russian financing, the question of a loan from the EBRD arose again. Moreover — an urgent loan. The allocation of funds was necessary as early as June 2003 so that the completion could be finished in 2004. Then the most interesting part begins... ARE WE EATING FROM ALL THE TROUGHS? So, they had a guarantee from Russia for financing the completion of KhNPP-2—RNPP-4 (the volumes are unknown — from 44 to 660 million dollars). They had the readiness of the EBRD to provide a loan (subject to certain conditions, and also, mind you, under conditions of strict monitoring of the distribution and use of funds and transparency of lending). Moreover, from January 1, 1998, a targeted tariff surcharge on electricity in the amount of 10% was introduced. That is, 10% of the cost of every kWh of electricity released by nuclear power plants is used for the completion of KhNPP-2—RNPP-4. Considering that NPPs produce almost 50% of the electricity in the country, consider that the completion is financed by everyone who consumes and pays for electricity in the state. Moreover, from February 1, 2002, by order of the President of Ukraine, daily priority transfers from the accounts of the Wholesale Electricity Market to the accounts of NNEGC “Energoatom” for the completion of KhNPP-2—RNPP-4 in the amount of 1 million 200 thousand UAH were introduced. Not a small amount, right? In June—July 2003, a decision to issue bonds of NNEGC “Energoatom” also came to light, at the expense of which the completion of KhNPP-2—RNPP-4 will also be carried out. So what kind of abyss is this?! How much does it cost, that completion? And what benefit will we have from it? How much it costs — no one will say. Since 1995, the cost of completing KhNPP-2—RNPP-4 has fluctuated from 722 million dollars to 1900 million dollars. It is still fluctuating today. And now let us move on to the benefit. A POT FOR THE HUNGRY
Do we need new power units at two nuclear power plants? Let us estimate. Ukraine currently has about 52,000 MW of electric generating capacity. Even in the winter period, when consumption is at its maximum, no more than 28,000 is used. Energy consumption efficiency in Ukraine exceeds the European level per unit of GDP by 6—10 times. One cannot even speak of efficiency here. Electricity losses during transmission to the consumer in some regional power distribution companies reach 40% (this is against the standard 8—10%). One can only remain silent about energy conservation. For us, it is still some kind of metaphysical category — it exists somewhere, and even works, but just not here — neither at the household nor at the industrial level. The fable that nuclear energy is the cheapest has long failed to withstand criticism. For example, let us take the most prosperous country in the world — the United States of America, where they do know how to count money. So, in the USA, when calculating the cost of nuclear energy, taking into account all expenses — and these are the costs for processing, burial, and lifelong maintenance of waste, costs for decommissioning a unit, for compensation for environmental damage, for insurance in case of a possible accident, etc. — they obtained an interesting result: 1 kW of electricity from a nuclear power plant is 1.5 cents more expensive than 1 kW of that produced by modern thermal power plants. Cents add up to dollars, dollars add up to tens, hundreds, thousands, millions... Such is the cheapness. Furthermore. According to EBRD estimates, at the existing tariff in Ukraine — 1.5 cents per 1 kWh — creditors will never get their money back. To avoid losses, it was proposed to increase the tariff to 2.5 cents. At such a cost, Ukraine cannot consume energy, but Europe will gladly buy it. The average cost of 1 kWh in Europe today is 4—5 cents. Moreover, Europe, which is currently phasing out its nuclear programs, needs to create new generating capacities. So, indeed, why not buy relatively cheap electricity from countries where there are lower safety requirements (consequently, lower costs for them, which determines the cheapness), and besides, not have any problems with nuclear power plant safety or nuclear waste. Thus, the profit that our officials promise from selling our energy abroad may cost us very dearly. I am not even talking about the threat of a second Chernobyl. The funds that will be used in the future for the conservation of power units, for their modernization, maintenance, processing, burial, and waste management can render this profit from sales null and void. Finally — we do not have nuclear fuel! All nuclear fuel for our nuclear power plants comes from Russia. So, if we assume that we really do not have enough electricity (although this is not the case), then, by completing the two power units, we find ourselves in the position of a hungry person who, instead of food, buys an expensive pot to cook this food, without having any products. A pretty picture, isn't it? And the creation of our own nuclear fuel cycle elements in Ukraine requires huge capital investments. And as for who will benefit from this — it is Russia, which, not only will it get an expansion of its nuclear fuel sales market, but also, by providing loans to Ukraine for the completion of the power units, will establish an additional dependence of Ukraine on the Russian fuel and energy complex, and this is already, excuse me, a direct threat. Photo by Oksana Tseatsura. They refuse the EBRD loan, then they agree, then they refuse again, then they announce the bankruptcy of NNEGC Energoatom, then they issue bonds. And with Russian loans, it is generally unknown: did they give them or not? Was it utilized or not? And in general, they supposedly finally decided to complete it with their own forces, and let the EBRD choke on its own money! (although we are not completely refusing the loan for modernization...). The only thing clear here is one thing: in 2004, the power units must be put into operation. Why this particular year became the zero hour for the two power units — everyone interprets it as they wish. Dark water in the clouds... I do not even want to assume that the urgent search for money for the completion and commissioning of two power units in this very year began because the money could have been used for something else during the year. As theosophists say, everything is possible, but I am not going to create unnecessary myths. As for the myth-making that we are being fed, that after the closure of Chernobyl we have a shortage of electricity, there is an opinion that it would be better for Ukraine to turn to alternative sources of electricity. And this is possible. Firstly, it is an increase in energy efficiency. According to experts' estimates, by 2010, 1/3 of the electricity used in the Ukrainian economy can be saved. Simple production processes and production control alone could reduce industrial electricity consumption by 6.3 billion kW. Secondly, the modernization of industrial technologies and the reconstruction of thermal power plants and hydroelectric power plants operating in Ukraine. Currently, not a single power plant operates using modern technology based on a high level of energy efficiency and low environmental impact. However, all power plants have the potential to increase capacity, improve energy efficiency, solve waste problems, and extend their service life by more than 20 years after modernization (let us note that the service life of a nuclear power plant is 30 years; in the thirtieth year, conservation, decommissioning, dismantling, and burial are already necessary). In addition, modernization would reduce the consumption of imported oil and gas. Thirdly, there is such a concept as wind energy. According to estimates by the Ukrainian Institute of Electrodynamics, it is possible to produce up to 30 billion kWh per year in Ukraine using wind energy. This is forty percent of the electricity currently produced in Ukraine by nuclear power plants. And let us also mention solar energy, geothermal energy, and biomass energy. There are interesting developments in all directions. And one could write and write about this... But for some reason in Ukraine, it is not the time for these problems... Radmila KORZH. When they talk about energy, and especially about the development of nuclear energy in our state, I am overcome by a strange feeling. It is as if I, as a citizen of this country, am being counted among the mentally ill who have an incurable inclination toward suicide. You know, there are such people: they are saved and saved, but they do it again, until one day they do not manage to save them in time. But I personally am fine with my psyche... I just cannot understand why Ukraine, a state that symbolizes the danger of nuclear energy for the whole world, is heading toward its logical end with some kind of pathological desire. For example, for me, a symbol of this desire is the old story with the completion of the second power unit of the Khmelnytskyi NPP and the fourth power unit of the Rivne NPP. This story is a very cunning and interesting thing. If we take into account that, despite all the assurances of the necessity of this action, we have neither a particular need for it nor spare funds.
«Слово Просвіти», CC BY 4.0; machine translation from Ukrainian by Prosvita.Digital · PDF en Wikimedia Commons ↗ · Traducción automática